Candidate Academy Course List

Courses are offered in a range of categories:

Contractual, Procurement and Project Delivery:
Basic Contract Administration CA (2025)
Getting Acquainted with Basic Contract Administration
and Quality Control
- ONLINE COURSE
Estimating Costing and Pricing CA (4)
Getting Acquainted with Estimating, Costing and Pricing of Construction Tenders
- ONLINE COURSE
GCC 2015 CA (2025)
Getting Acquainted with General Conditions of Contract for Construction Works (GCC 2015)
- (Available on request)
Getting Acquainted with General Conditions of Contract for Construction Works 4th Edition (GCC 2025)
- ONLINE COURSE
Getting Acquainted with Planning, Scheduling and Programming for Construction Projects
- ONLINE COURSE
Infrastructure Asset Management CA (2)
How to develop an Infrastructure Asset Management Plan
in 3 months
- ONLINE COURSE
Environmental:
Geosynthetics in Soil Reinforcement CA (2023)
Getting Acquainted with Geosynthetics in Soil Reinforcement
- (Available on request)
Understanding the implications of operating a Landfill CA(2)
Understanding the Technical Implications of Developing and Operating a Landfill
- ONLINE COURSE
Roads and Stormwater:
Stormwater Design CA(5)
Getting Acquainted with Basic Stormwater Design
- ONLINE COURSE


Resident Engineer Roads CA(3)
Getting Acquainted with being a Resident Engineer on Roads Projects
- ONLINE COURSE
Road Construction and Maintenance Brochure CA (1)
Getting Acquainted with Road Construction and Maintenance
- ONLINE COURSE
Management and Rehabilitation Design of Urban Road Pavements CA(2)
Getting Acquainted with the Management and Rehabilitation Design of Urban Road Pavements
- ONLINE COURSE
Water Services:
Sewer Design CA(3)
Getting Acquainted with Sewer Design
- ONLINE COURSE
Water Reticulation Design CA(7)
Getting Acquainted with Water Reticulation Design
- ONLINE COURSE
Water Resource Management CA(1)
Getting Acquainted with Water Resource Management
- (Available on request)
Pressure Pipeline and Pump Station Design and Specification
- ONLINE COURSE
Getting Acquainted with Wastewater Treatment Plant
- ONLINE COURSE
Resident Engineer Pipelines CA(2)
Getting Acquainted with being a Resident Engineer on Pipeline Projects
- ONLINE COURSE

Road to Registration:
R2R for Candidates CA (4)
Road to Registration for
Candidate Engineers, Technologists & Technicians - ONLINE COURSE
R2R for Mature Candidates CA (2025)
Road to Registration for Mature Engineers, Technologists & Technicians
- ONLINE COURSE
Road-to-Registration-for-Mentors,-Supervisors-and-HR-Practitioners---ONLINE-COURSE
Road to Registration for Mentors, Supervisors & HR Practitioners
- ONLINE COURSE
The ECSA application & forms unpacked CA (2024)
The ECSA application & forms unpacked: A half-day workshop for Mentors and Supervisors
- (Available on request)
Project Management:
The-direct-route-to-registration-as-a-CPM-or-CM-CA-(2025)
The direct route to registration as a Construction Project Manager or Construction Manager
- ONLINE COURSE
Understanding the 6 Stages of the Project Life Cycle CA(2)
Understanding the 6 Stages of the Project Life Cycle to register as a Construction Project Manager or Construction Manager
- ONLINE COURSE
PMI Construction Professional (PMI-CP)™️
- Self-paced
ONLINE COURSE
Professional Development:
Ethics CA(2)
Getting Acquainted with Ethics in South African Engineering
- (Available on request)
Technical Report Writing and Presentation Skills CA (2)
Getting Acquainted with Technical Report Writing and Presentation Skills
- ONLINE COURSE